Code for laying of cable marker pile
1、电缆标志桩应安装在管道的正上方,当电缆标志桩用作转角桩时,应安装在转角段中点的正上方。当管道正上方没有安装条件时,可设置在相对距离教近的路边绿化带内,并在电缆标志桩上标明管桩适意图。
1. The cable marker pile shall be installed directly above the pipe, and when it is used as the corner pile, it shall be installed directly above the midpoint of the corner section. When there is no installation condition directly above the pipeline, it can be set in the roadside green belt which is relatively close to the school, and the pipe pile acceptability diagram shall be marked on the cable marker pile.
2、全封闭禁入道路不得设置电缆标志桩。电缆标志桩的安装间距宜为100m。地面平坦、视碍少、管道路由顺直的情况,电缆标志桩的安装间距可大100m。特殊地段,具体铺设规范制度进行管道标志桩的铺设!
2. No cable marker post shall be set up on the totally closed roads. The installation spacing of cable marker pile should be 100m. When the ground is flat, there are few obstacles, and the pipeline route is straight, the installation distance of cable marker pile can be greater than 100m. For special sections, the specific laying standard system shall be applied to the laying of pipeline marker piles!
3、一般深埋40cm,漏出地面60cm。
3. Generally, it is 40 cm deep and 60 cm above the ground.
下有电缆标志桩埋设方法
Burying method of cable marker pile
首先挖坑,将电缆标志桩放入,有条件可以使用钢筋进行固定,填入混凝土固定冷却成型。
First, dig a pit, put the cable marker pile into it, if possible, fix it with steel bars, and fill it with concrete to fix and cool it.